The plant and equipment register for
PUWER and LOLER
compliance
Never miss another inspection due date. Every certificate, record, document and photo in one place so you're always audit-ready
Asset Register
238 assets
89%compliant211 of 238 in date
Compliant
211
Due soon
23
Overdue
4
AssetNext due
Genie Z-45 MEWP
LIFT-0142LOLER
Valid
14 Sept 2026
Hilti TE 60 SDS hammer
PAT-0931PAT
Due in 11 days
21 Jun 2026
JCB 3CX backhoe loader
PUWER-0077PUWER
Valid
06 Nov 2026
Combilift C4000 forklift
LIFT-0205LOLER
Overdue 20d
21 May 2026
Megger MFT1557 tester
CAL-0418Calibration
Due in 23 days
03 Jul 2026
Reminder sent
Hilti TE 60 — PAT due in 11 days
Capabilities
What EquipReg does
Everything your spreadsheet can't do.
Core
Never miss a thorough examination.
EquipReg works out the correct inspection interval for every piece of equipment: LOLER's 6 or 12 month schedule, PUWER, PAT, calibration. Reminders go out automatically. An overdue dashboard shows what needs attention. One tap marks something out of service.
Audit-ready evidence on demand.
Export a LOLER Schedule 1 report (all 11 fields) or a complete PUWER inspection record as a PDF. The history behind it is permanent and cannot be altered. Holds up to an HSE inspection or an ISO 9001 / 45001 audit.
Every certificate against its asset.
Declarations of Conformity, inspection certificates, calibration records, manuals, photos. All attached to the asset record. Not in someone's inbox. Not in a shared drive no one can find.
Powered by AI
AI reads your old certificates for you.
Upload your existing LOLER, PUWER, PAT, and calibration PDFs. EquipReg reads each one and fills in your asset records and inspection history automatically. The worst part of switching from a spreadsheet, done.
HAV, noise and service data from the manual.
Drop in a manufacturer manual or spec sheet. EquipReg pulls out the vibration and noise figures your HAVS and noise risk assessments need, along with service intervals and use restrictions. No more reading 200 pages to find one number.
Ask your register anything, in plain English.
"How often does this scissor lift need a thorough examination?" Ask the question, get the answer. The relevant regulation cited. Your next due date shown.
Risk flagged before an auditor finds it.
When inspection intervals start slipping, EquipReg flags it. Deal with the problem before it becomes an audit finding.
Compliant before the inspector arrives.
Join the waitlist and be first to move your register off the spreadsheet — and onto a system that tells you what's due.